Coastwise Transportation; Outer Continental Shelf; Wells; Pristine Seabed; 46 U.S.C. § 55102; 19 C.F.R. § 4.80b
No Headquarters ruling in this index revokes or modifies this ruling. That is not confirmation that it is still in effect: this index does not hold every Headquarters ruling. Confirm its current status with CBP before relying on it (ruling on CBP CROSS). Text last read from CBP on Nov 21, 2026.
Key passages, quoted from the ruling
- The transportation of mooring lines from a U.S. coastwise point to pre-installed mooring piles on the OCS for OCSLA purposes by a non-coastwise qualified vessel as described above would violate the Jones Act, 46 U.S.C. § 55102.
Ruling text
This is in response to your October 13, 2025, request for a ruling pursuant to 19 C.F.R. § 177.2 on behalf of Subsea 7 (US) LLC (“Subsea 7”) regarding whether the transportation of mooring components to pre-installed mooring piles located on the outer continental shelf 1 Our decision follows. (“OCS”), as described below, would violate the coastwise laws. FACTS: The following facts are from your ruling request.
Subsea 7 will load twelve mooring lines onto a foreign-flag installation vessel (“FFIV”) at a U.S. port for transportation to the oil and gas lease block designated as [ ].
Each mooring line will con- sist of a subsea mooring connector (“SMC”), a bottom chain segment, a lower polyester rope segment, a connecting chain segment, an upper polyester rope segment, a tensioner connecting chain segment, an in-line mooring tensioner (“ILMT”), a tensioner adjustment chain segment, 1 You have asked this office for confidential treatment of specific information relating to the project site location.
If this office receives a Freedom of Information Act request for your submission, CBP Regulations (See 19 C.F.R. § 177.2, et seq.) regarding the disclosure of business information provide that the submitter of business information will be advised of receipt of a request for such information whenever the business submitter has in good faith desig- nated the information as commercially or financially sensitive information.
We accept your request for confidential treatment as a good faith request. and various rigging and ancillaries. The mooring line installation process is described as fol- lows: Once at the location on [ ] , the paying out of each mooring line will occur as follows: Subsea 7 will connect the SMC to the bottom chain while on board the FFIV. The SMC and the bottom chain will be paid out from FFIV chain lockers through the onboard lay system over the stern roller.
Once the SMC and bottom chain are paid out, Subsea 7 will connect the lower polyester segment to the end of the bottom chain. Subsea 7 will continue to pay out the lower polyester segment over the FFIV’s stern roller. Following the paying out of the lower polyester, Subsea 7 will attach the upper polyester segment and continue lay out operations. Subsea 7 will continue to pay out the mooring line until it connects the SMC to the pre-installed mooring pile.
Once the SMC is connected, the FFIV will pay out the mooring line along the pre-determined lay route. Subsea 7 will connect the tensioner connecting chain segment, ILMT, tensioner adjustment chain segment and related ancillaries to the upper polyester segment. Once the entire mooring line is assembled, it will be laid down along the pre-determined lay route and within the pre-determined lay toler- 2 ances required.
No information was provided regarding whether the FFIV will be in contact with the sea- bed upon arrival at [ ], or whether seabed devices other than the pre-installed mooring piles have been installed at [ ].
The text above is an excerpt. The official ruling, with its letterhead, signature and any attachments, is on CBP CROSS (H360021).