Coastwise Transportation; Outer Continental Shelf; Wind Turbines; 46 U.S.C. § 55102; 19 CFR §§ 4.80a and 4.80b; 43 U.S.C. § 1333.
No Headquarters ruling in this index revokes or modifies this ruling. That is not confirmation that it is still in effect: this index does not hold every Headquarters ruling. Confirm its current status with CBP before relying on it (ruling on CBP CROSS). Text last read from CBP on Nov 21, 2026.
Ruling text
This letter is in response to your April 1, 2026, ruling request submitted on behalf of your client, Vestas American Wind Technology, Inc. (“Vestas”), regarding whether certain heavy- duty tools used for the offshore installation of wind turbine generators would be considered vessel equipment, whether their movement on a foreign-flagged offshore installation vessel (“OIV”), as described below, would contravene the coastwise laws, and whether the subject tools would be subject to duty. Our decision follows.
FACTS Your April 1, 2026, ruling request asserts that Vestas is a U.S. company that supplies and installs wind turbine generators (WTGs) for the Empire Wind Project off the southern coast of Long Island. The installation of WTGs requires the use of the M/V MAERSK VIRIDIS (“VIRIDIS” or “OIV”), a 40,000 ton, purpose-built vessel designed specifically for use in 1 installing offshore WTGs.
The subject vessel is Singapore-built and Danish-flagged. 1 “Full technical specifications (WTIV and ATBs),” downloaded from https://maerskoffshorewind.com/maersk- viridis/, last accessed Aug. 7, 2026. The VIRIDIS will sail directly from Singapore to a location approximately 25 nautical miles off the U.S. coast of Pascagoula, Mississippi. Upon arrival at Pascagoula, the VIRIDIS will be jacked up in contact with the seabed of the Outer Continental Shelf (OCS”).
As part of the generator installation process, the VIRIDIS requires specialized tools (collectively “Tools”) to perform its core installation work, including customized lifting tools to grip and manipulate the WTG components, as well as containers containing spare parts for the specialized tools. The VIRIDIS will not arrive at Pascagoula with these tools aboard. Rather, the VIRIDIS will be outfitted with these tools while “jacked-up” in contact with the seabed of the OCS.
In order to equip the VIRIDIS with these specialized tools, the Tools will be shipped from Denmark to the port of Pascagoula, Mississippi, aboard a non-coastwise-qualified vessel. The non-coastwise-qualified vessel will arrive from Denmark transporting the tools to the Port of Pascagoula. Upon arrival at Pascagoula, the Tools will be either the subject of an immediate exportation entry; or admitted into a Foreign Trade Zone (“FTZ'”).
At the Port of Pascagoula, the tools will be unloaded from the non-coastwise-qualified vessel and then loaded onto a coastwise-qualified vessel to be transported to the VIRIDIS. The coastwise-qualified vessel will deliver the tools to the VIRIDIS while it is jacked-up in contact with the seabed of the OCS in the Gulf of America. The VIRIDIS will use its crane to transfer the Tools from the coastwise- qualified vessel while the coastwise-qualified vessel is positioned alongside the VIRIDIS using dynamic positioning.
Once the Tools are loaded onto the VIRIDIS, they will be secured to the deck while the vessel transits to the Empire Wind Project off the southern coast of Long Island. The VIRIDIS and its Tools will then be used for the installation of WTGs at the work site for 8- 12 months.
The text above is an excerpt. The official ruling, with its letterhead, signature and any attachments, is on CBP CROSS (H361137).